- Home
- Government
- Departments
- Water Resources
- Stormwater & Utility Engineering
- Riparian Buffers
Riparian Buffers
Purpose of Riparian Buffers
Riparian (stream) buffers help promote good water quality.
- Buffers remove pollutants such as oil from roads and nutrients from over-fertilized lawns.
- Buffers also slow floodwaters, trapping sediment to help build stream banks and protect downstream property.
- By slowing down stormwater runoff, the buffer vegetation allows water to soak into the earth and recharge groundwater.
Requirements
- A 100-foot buffer is required on any stream that flows year-round (perennial stream) and a 50-foot buffer on any stream that only flows during rain events (intermittent stream). The lengths are measured from the top of bank.
- The Town Unified Development Ordinance (UDO) lists the buffer zones and allowable uses within each zone.
Buffer Impacts
If someone wants to build in or otherwise disturb a riparian buffer, certain documentation is required. First please refer to UDO Section 6.1.11(G)(1) for the Table of Uses to see the list of what is "Allowable".
- If a use is listed as Allowable, please submit a Request for a No Practical Alternatives (PDF) determination to the Town.
- If according to the Table of Uses mitigation is required, a Buffer Impact Mitigation (PDF) form must also be submitted.
Watershed Protection Overlay District Map
The Watershed Protection Overlay District Map (PDF) illustrates the buffered streams in Apex.
- A shaded green buffer represents a 100-foot buffer on a perennial stream.
- A blue shaded buffer represents a 50-foot buffer on an intermittent stream.
- The Primary Watershed Protection District (red area) is land identified by the State as water supply watershed protected areas.
- The Secondary Watershed Protection District (orange area) is all other land within Apex corporate limits and ETJ.
Homeowner Information
If you are considering improvements to your property such as a deck, patio, shed, or pool, in addition to applying for appropriate building permits, consider whether you will be building in a riparian buffer. State and local regulations restrict clearing and building within 50 to 100 feet of streams according to the Table of Uses referenced above.
Please note that within the buffer, it IS allowable to:
- Prune vegetation
- Remove dead trees
- Remove nuisance vegetation (such as poison ivy, vines, and bamboo)
Buffer Call Information
Please contact Stormwater staff at (919) 362-8166 for more information about buffered streams. To request a buffer call determination on your property, please complete a Buffer Call Application (PDF). A Right of Entry form is one of the required items for all buffer call applications.
Further Resources
For more information, check out our Watershed Protection Brochure (PDF).