Justice Heights Extension

This project will extend Justice Heights Street from its existing stub west of South Salem Street to intersect Apex Peakway, add sidewalk, and extend side path along Apex Peakway to the north. The project will provide improved local connectivity for traffic flow south of NC 55 and pedestrian connectivity between Salem Street and Apex Peakway through the Justice Heights neighborhood.

  • Status (02/01/24): Topographic surveying complete; property surveys in progress; preliminary design in progress.
  • Lead Agency: Town of Apex, Adam Stephenson, (919) 249-3417
  • Estimated Completion: 2026